F3 Hits Strongest Hole to Date 3.82m of Off-scale (>65,535 cps)

Critical Minerals & Rare Earths, Energy, Oil & Gas + Uranium

Extends JR Zone to 105m in Length

March 27, 2023 (Source) – F3 Uranium Corp (TSXV: FUU) (OTCQB: FUUFF) (“F3” or “the Company“) is pleased to announce scintillometer results from the final nine holes of the winter drill program at the JR Zone on the Patterson Lake North (“PLN”) Property, including five high grade intercepts. Drill hole PLN23-060 collared on line 060S has intersected the strongest radioactivity to date at the JR Zone. It was collared up dip of hole PLN23-052 (see news release February 21, 2023) and intersected radioactivity over 17.5m, including 3.82m of continuous off-scale radioactivity >65,535 cps between 244.0m and 247.82m. PLN23-061 stepped out further to line 075S and resulted in 14.0m of mineralization, including 2.81m of composite off-scale (>65,535 cps) radioactivity within 5.08m of composite radioactivity >10,000 cps. An additional drill hole was added to the program stepping out further along strike on line 090S, where PLN23-062 intersected 6.0 m of composite radioactivity including 1.0m of continuous off-scale (>65,535 cps) radioactivity. These holes expanded the strike length of the JR Zone by another 30m, to a current length of 105m.

Raymond Ashley, Vice President Exploration, commented:

“With the final nine holes of the winter 2023 drill program the technical team is delighted to announce the strongest off-scale radioactivity drilled so far at the JR Zone with infill hole PLN23-060 on line 060S, making it the best hole to date. Moreover, the two holes which have expanded the JR Zone to a current length of 105m both intersected off-scale radioactivity >65,535 cps, hole PLN23-061 which stepped out to line 075S and hole PLN23-62 which stepped out further to line 090S. Additional holes will be planned for the summer program on section 30N as the single hole drilled on that section, PLN23-055, did not intersect mineralization. This is a fantastic ending to a very successful winter program of growing the JR Zone along strike towards the south within the A1 main shear zone, following the direction in which strong continuity of high grade mineralization had been established earlier in the drill program.”

Drilling Highlight:

PLN23-060

  • 17.5m composite mineralization from 231.5m – 253.5m, including
    • 4.98m composite mineralization of >10,000 cps between 243.17m – 252.83m, further including 3.82m of continuous off-scale (>65,535 cps) radioactivity from 244.00m – 247.82m (see Photo 1.)

Main Intercepts:

PLN23-054 (line 075S):

  • 14.5m composite mineralization from 244.0m – 269.0m with a peak radioactivity of 6,600 cps from 248.5m – 249.0m

PLN23-056 (line 030S):

  • 11.5m composite mineralization from 237.5m – 249.0m, including
    • 1.34m continuous mineralization of >10,000 cps radioactivity between 247.16m – 248.50m with a peak of 32,300 cps

PLN23-057 (line 045S):

  • 7.0m composite mineralization from 246.0m – 268.5m with a peak radioactivity of 1,400 cps from 252.0m – 252.5m

PLN23-058 (line 060S):

  • 1.0 m continuous mineralization from 253.0m – 254.0m with a peak radioactivity of 360 cps

PLN23-059 (line 045S):

  • 17.0m composite mineralization from 238.5m – 255.5m, including
    • 1.32m composite mineralization of >10,000 cps radioactivity between 243.18m – 254.00m with a peak radioactivity of 31,100 cps

PLN23-061 (line 075S):

  • 14.0m composite mineralization from 246.0m – 260.0m, including
    • 5.08m composite mineralization of >10,000 cps radioactivity between 246.71m – 254.93m, further including 2.81m of composite off-scale (>65,535 cps) radioactivity

PLN23-062 (line 090S):

  • 6.0m composite mineralization from 240.5m – 256.5m, including
    • 1.0m continuous off-scale (>65,535 cps) radioactivity between 246.5m – 247.5m

Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials. All depth measurements reported are down-hole and true thickness are yet to be determined. Samples from the drill core are split in half on site and are standardized at 0.5m lengths. One half of the split sample will be submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK. for lithogeochemical analysis using their “Uranium Package”.

All depth measurements reported are down-hole and true thickness are yet to be determined but the Company estimates true thickness of the reported intervals in this news release to be close to reported interval widths.

Photo 1: PLN23-060 Drill Core Photo
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_002full.jpg

Table 1. Drill Hole Summary and Handheld Spectrometer Results

Collar Information* Hand-held Spectrometer
Results On Mineralized Drillcore
(>300 cps / >0.5m minimum)
Athabasca
Unconformity
Depth (m)
Total
Drillhole
Depth
(m)
Hole IDSection
Line
EastingNorthingElevationAzDipFrom
(m)
To
(m)
Interval (m)Max CPS
PLN23-054075S587713.96410660.4545.753.9-58.2244.00244.500.50820209.0371
       244.50245.000.50810  
       245.00247.002.00<300  
       247.00247.500.50350  
       247.50248.000.50580  
       248.00248.500.50630  
       248.50249.000.506600  
       249.00250.001.00<300  
       250.00250.500.50310  
       250.50251.000.50430  
       251.00251.500.50470  
       251.50252.000.50580  
       252.00252.500.50880  
       252.50253.000.50650  
       253.00253.500.50910  
       253.50254.000.50610  
       254.00254.500.50350  
       254.50255.000.50440  
       255.00255.500.50620  
       255.50256.000.50680  
       266.50267.000.502100  
       267.00268.501.50<300  
       268.50269.000.50330  
PLN23-055030N587668.46410756.9545.454.0-55.5no radioactivity >300 cps209.0344
PLN23-056030S587705.06410718.0545.254.2-59.5237.50238.000.50340211.0356
       238.00239.001.00<300  
       239.00239.500.50300  
       239.50240.000.50<300  
       240.00240.500.50300  
       240.50241.000.50370  
       241.00241.500.504400  
       241.50242.000.507500  
       242.00242.500.503900  
       242.50243.000.50610  
       243.00243.500.50<300  
       243.50244.000.501100  
       244.00244.500.50350  
       244.50245.501.00<300  
       245.50246.000.50320  
       246.00246.500.50<300  
       246.50247.000.501400  
       247.00247.160.162300  
       247.16247.500.3417300  
       247.50248.000.5032300  
       248.00248.500.5028800  
       248.50249.000.502700  
PLN23-057045S587704.36410689.5544.954.3-62.3246.00246.500.50380199.9362
       249.00249.500.50840  
       249.50250.501.00<300  
       250.50251.000.50350  
       251.00251.500.50<300  
       251.50252.000.50720  
       252.00252.500.501400  
       252.50253.501.00<300  
       253.50254.000.50610  
       254.00254.500.50930  
       257.00257.500.501100  
       268.00268.500.50440  
PLN23-058060S587715.66410678.4544.554.6-64.9253.00253.500.50340188.3356
       253.50254.000.50360  
PLN23-059045S587717.06410702.1545.155.4-61.1238.50239.000.50420208.5362
       239.00239.500.50460  
       239.50240.000.504900  
       240.00240.500.50890  
       240.50241.000.50440  
       241.00241.500.503800  
       241.50242.000.50770  
       242.00242.500.50910  
       242.50243.000.504700  
       243.00243.180.188900  
       243.18243.500.3219100  
       243.50244.000.5022200  
       244.00244.500.502200  
       244.50245.000.50480  
       245.00245.500.50<300  
       245.50246.000.50340  
       246.00246.500.50300  
       246.50248.001.50<300  
       248.00248.500.50430  
       248.50249.000.502200  
       249.00250.501.50<300  
       250.50251.000.50300  
       251.00251.500.50370  
       251.50252.000.501100  
       252.00252.500.502300  
       252.50253.000.50310  
       253.00253.500.50<300  
       253.50254.000.5031100  
       254.00254.500.502800  
       254.50255.000.501500  
       255.00255.500.501300  
PLN23-060060S587728.76410689.6545.054.8-62.2231.50232.000.50690203.0356
       232.00232.500.50710  
       232.50233.000.501600  
       233.00233.500.50480  
       238.00238.500.50320  
       238.50239.000.50880  
       239.00239.500.509100  
       239.50240.000.506300  
       240.00240.500.509500  
       240.50241.000.50840  
       241.00241.500.50880  
       241.50242.000.50420  
       242.00242.500.502700  
       242.50243.000.507100  
       243.00243.170.177000  
       243.17243.500.3328800  
       243.50244.000.5030600  
       244.00244.500.50>65535  
       244.50245.000.50>65535  
       245.00245.500.50>65535  
       245.50246.000.50>65535  
       246.00246.500.50>65535  
       246.50247.000.50>65535  
       247.00247.500.50>65535  
       247.50247.820.32>65535  
       247.82248.000.185200  
       248.00248.500.50840  
       248.50249.000.50640  
       249.00249.500.50710  
       249.50250.000.501100  
       250.00250.500.501000  
       250.50251.000.50370  
       251.00251.500.50850  
       251.50252.000.50470  
       252.00252.500.50910  
       252.50252.830.3324200  
       252.83253.000.171900  
       253.00253.500.50470  
PLN23-061075S587720.06410666.7545.554.6-56.6246.00246.500.50360212.7368
       246.50246.710.212500  
       246.71247.000.2912600  
       247.00247.500.505200  
       247.50248.000.505100  
       248.00248.120.126100  
       248.12248.280.1614100  
       248.28248.500.226400  
       248.50248.670.177900  
       248.67248.810.1410000  
       248.81249.000.192200  
       249.00249.500.502900  
       249.50250.000.506300  
       250.00250.500.5054800  
       250.50250.690.197400  
       250.69251.000.31>65535  
       251.00251.500.50>65535  
       251.50252.000.50>65535  
       252.00252.500.50>65535  
       252.50253.000.5024500  
       253.00253.500.50>65535  
       253.50254.000.50>65535  
       254.00254.320.3223400  
       254.32254.500.183200  
       254.50254.570.072700  
       254.57254.930.3634200  
       254.93255.000.072400  
       255.00255.500.501000  
       255.50256.000.50570  
       256.00256.500.502600  
       256.50257.000.50<300  
       257.00257.500.50790  
       257.50258.501.00<300  
       258.50259.000.50810  
       259.00259.500.50430  
       259.50260.000.50500  
PLN23-062090S587732.46410655.3544.754.7-57.7240.50241.000.50730204.5359
       241.00241.500.501100  
       241.50242.000.50880  
       242.00242.500.50440  
       245.50246.000.501300  
       246.00246.500.50350  
       246.50247.000.50>65535  
       247.00247.500.50>65535  
       247.50248.000.501200  
       248.00248.500.50650  
       255.50256.000.50370  
       256.00256.500.507300  

About Patterson Lake North:

The Company’s large 39,946-hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium’s Triple R and NexGen Energy’s Arrow high-grade uranium deposits, an area which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium’s Triple R deposit.

Qualified Person:

The technical information in this news release has been prepare in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by Raymond Ashley, P.Geo., Vice President of Exploration of F3 Uranium Corp, a Qualified Person. Mr. Ashley has verified the data disclosed.

About F3 Uranium Corp.:

F3 Uranium is a uranium project generator and exploration company, focusing on projects in the Athabasca Basin, home to some of the world’s largest high grade uranium discovery. F3 Uranium currently has 16 projects in the Athabasca Basin. Several of F3’s projects are near large uranium discoveries including Triple R, Arrow and Hurricane.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the Properties, are “forward-looking statements.” These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or disapproved the contents of this press release, and do not accept responsibility for the adequacy or accuracy of this release.

F3 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2

Contact Information
Investor Relations
Telephone: 778 484 8030
Email: [email protected]

ON BEHALF OF THE BOARD
“Dev Randhawa”
Dev Randhawa, CEO

Plan Map
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_007full.jpg

(See cross sections bellow)

Figure 1
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_008full.jpg 
Figure 2
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_009full.jpg
Figure 3
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_010full.jpg
Figure 4
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_011full.jpg
Figure 5
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_012full.jpg

 

Figure 6
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/159913_ac1b5691e49bdb6e_013full.jpg

F3 Uranium Corp.

F3 Uranium Corp. (TSXV: FUU) is a uranium exploration company advancing its newly discovered high-grade JR Zone and exploring for additional mineralized zones on its 100%-owned Patterson Lake…